Deployable Energy’s new compact nuclear reactor
The reactor was produced under President Trump’s 2025 nuclear reactor plan. It was designed by Australian Bobby Gallagher and his team in Houston. It can produce one megawatt of power, at a cost of 15 cents per kilowatt hour, for five years before refueling is required. The entire reactor can fit on the bed of a Ford F150 pickup. More importantly, it can be manufactured in a factory, fits into one 20-foot shipping container, uses the existing conventional supply chain, and requires no exotic custom-made components.


Bengali (Bangladesh) ·
English (United States) ·